≡≡
Print version

Volodymyr-Volynsk Industrial Park, Volodymyr-Volynsk city

Investment proposal Greenfield

  • Location: 
    • Industrial Park “Volodymyr-Volynsk”, Volodymyr-Volynsk, Lutska Str. (former filtration fields of the sugar factory)
  • Area properties:
    • The maximum available (as one plot) [ha]: 37,6570 hа
    • Opportunities for development (brief description): placement and operation of main, auxiliary and auxiliary buildings and structures of enterprises of processing, machine-building and other industries
  • Property information:
    • Owners: communal property of Volodymyr-Volynsk City Council
    • Availability of valid conceptual design: yes
    • Zoning: zone of placement of the IV class of harmfulness enterprises (for placement and operation of the main and auxiliary buildings, and constructions of the processing enterprises, machine-building and other industry)
  • Features of land (ground):
    • Type of soil on the site (ha): sod-podzolic unglazed cohesive sandy soils
    • Difference in land leveling (m): 2,0 m
    • Present land use: is not used
    • Pollution of ground and underground water: no
    • Conducted geological investigation of the site: no
    • Risk of flooding or landslides: no
    • Underground obstacles: no
    • Ground and air obstacles: no
    • Environmental restrictions: no
    • Buildings or other constructions on the ground : no
  • Transport position:
    • Access of roads to the site (type and width of accessible road): a field road to the highway – 20 m
    • The nearest motorway / national road (km): The land plot is located along the highway of state importance Ustyluh-Lutsk-Rivne H-22
    • Railway track (km): 3,0 km
    • Railway side track (km):0,5 km
    • The nearest regular airport (km): Lviv city – 140 km
    • The nearest sea port (km): 680 km (Gdansk, Republic of Poland), 850 km (Odessa)
  • Available Infrastructure
    • Electricity: yes
      • connection point (distance from the site boundary) (m): from the power line 30 m
      • electric voltage – 35 kW
    • Gasification: yes
      • connection point (distance from the site boundary) (m): 600 m
    • Water supply: yes
      • connection point (distance from the site boundary) (m): 150 m
    • Sewage systems: construction of own treatment facilities
    • Telecommunications: no
  • Proposal is designed by: 
    • Department of Foreign Relations, Investment and Tourism and Resorts of the Regional State Administration
  • Contacts: 
    • Chulipa Igor Dmytrovych
    • Balbuza Veronika Mykolayivna
  • Phones: 
    • +38(0332) 778 128
    • +38(0332) 778 108
    • +38(0332) 778 202


Input Error!
Wrong
Captcha!