Print version

Bucyn village, Starovyzhiv district

Greenfield investment offer

  • Site name:
    • Tract "Bilya Krynytsi"
  • Location:
    • Starovyzhiv district
  • Distance to:
    • the nearest settlement and the distance from it to the site (km): the village of Butsyn, Starovyzhiv district, Volyn region 0.5 km
    • the nearest district center and distance to it (km): town. Stara Vyzhivka, Volyn region 12 km
    • the nearest regional center and distance to it (km): Lutsk 107 km
    • nearest residential building (km): 0.300 km
    • to the border of the residential area (according to the master plan of the settlement) (km): 0.300 km
  • Total plot area:
    • 3029 ha
  • Characteristics of land (plots):
    • Terrain, mark above sea level (m), the difference between the highest and lowest elevations of the site: flat terrain
    • Neighboring plots: borders with reserve lands of Bucyn village council not provided for ownership or use (pastures) outside the settlement of Bucyn village council and with public lands (field road) outside the settlement of Bucyn village council of Starovyzhiv district of Volyn region
    • Buildings and structures, if they are on the site, who owns them (describe): no
    • Are there underground and surface obstacles on the site: no
    • Environmental requirements and restrictions: none
    • Contamination of soil, surface and groundwater: none
    • Flooding of the site during floods: no
  • The legal status:
    • Form of ownership: state
    • Available title documents of the owner: no
    • Cadastral number: 07250805000:30:000:371
    • User: no
    • For what purposes the land plot is used: not used
    • The plot is located within or outside the settlement: outside the settlement
    • Availability of urban planning documentation: no
    • Classification of the type of purpose of the land: section A 01.01 (for commercial agricultural production)
    • The presence of legal restrictions (encumbrances) of land: no
    • Form of transfer of the plot to the investor: sale of the lease right
    • Estimated cost of land for rent: 7551.65 UAH/m2
  • Transport and engineering infrastructure:
    • Access road for trucks: Road Bucyn-Stara Vyzhivka width 10 m (asphalt)
    • Distance to the highway of national importance (km): Kovel-Ratne 2 km.
    • Name of the freight railway station and the distance by road from it to the section (km): Vyzhva station 13 km
    • Name of the airport and distance by road from it to the site: no
    • Name of the nearest river and distance from it to the site, km: Vyzhivka river 12 km
    • Availability of public transport routes to the site (buses, trains): bus service
  • Available infrastructure
    • Electricity:
      • Distance to the existing power line (transmission line) 0.8 km
      • Power line voltage 10 000 Kv
      • Power reserve at the place of possible connection to the transmission line (kW): sufficient
      • Distance to the operating transformer substation, 2 km
      • Voltage at the transformer substation 10/04 Kv
      • Power reserve at the transformer substation (kW) is sufficient
      • Estimated cost of gas supply to the site (thousands of US dollars): according to estimates
    • Gasification:
      • Distance to the existing gas pipeline 0.5 km
      • Diameter of the gas pipeline: 150 mm
      • Gas pressure in the gas pipeline (kgf/cm2): high
      • Power reserve at the place of possible connection to the gas pipeline (m3/h): sufficient
      • Distance to the operating gas distribution station (GDS), 1.5 km
      • Power reserve of the gas distribution station (m3/h): sufficient
      • Estimated cost of gas supply to the site (thousands of US dollars): according to estimates
    • Water supply: no
      • How to provide water supply on the site (describe options): artesian well
      • Distance to the possible connection point to the existing water supply system is 2.0 km
      • Diameter of the operating water supply system: 200 mm
      • Power reserve of the operating water supply system in the place of possible connection (m3/h) is sufficient
      • Estimated cost of gas supply to the site (thousands of US dollars): according to estimates
    • Sewerage: no
      • How to provide drainage (sewerage) on the site (describe options): stationary cesspool
      • Distance to the possible connection point to the existing drainage system 2.0 km
      • Diameter of the operating sewer water supply (collector) in the place of possible connection to the drainage system 300 mm
      • Power reserve of the existing drainage system in the place of possible connection (m3/h): sufficient provided that the overhaul of treatment facilities is carried out
      • Are sewage effluents fed to existing treatment plants from the sewage system (collector)? No
      • The capacity reserve of existing treatment facilities (m3/h) is sufficient
      • Estimated cost of drainage from the site (thousand US dollars): According to estimates
    • Communication networks:
      • Is it possible to provide a fixed telephone connection: it is possible
      • Is there stable mobile coverage on the site and which operators have stable coverage
  • The proposal is prepared by:
    • Department of Foreign Relations, Investment Attraction and Tourism and Resorts of the Regional State Administration
  • Contact persons:
    • Chulipa Igor Dmitrovich
    • Balbuza Veronika Nikolaevna
  • Phones:
    • +38 (0332) 778 108
    • +38 (0332) 778 194
    • +38 (0332) 778 202


Input Error!
Wrong
Captcha!