Digtiv village Volodymyr-Volynskyi district
Investment proposal Greenfield
- Location:
- Digtiv village, Volodymyr-Volynsk rayon
- Area properties:
- The maximum available (as one plot) [ha]: 3,3 ha
- Opportunities for development (brief description): construction of industrial facilities, industrial territory
- Property information:
- Estimated land price (UAH / m2): UAH 46.59 / square meter
- Property information:
- Owners: Volodymyr-Volynsky City Council, communal property
- Availability of current conceptual design: no
- Opportunities for development (brief description): location and operation of the main and auxiliary facilities, buildings and constructions of the enterprises of processing, machine-building and other industry
- Zoning: location of enterprises of the IV class of harmfulness (for location and operation of the main and auxiliary buildings and constructions of the enterprises of processing, machine-building and other industry)
- Features of land (ground):
- Type of soil on the site (ha): black, podzolic and slightly degraded and dark gray strongly degraded, slightly washed away, loamy soils
- Difference in land leveling (m): 1.5 m
- Present land use: is not used
- Pollution of ground and underground waters: no
- Conducted geological investigation of the site: no
- Risk of flooding or landslides: no
- Underground obstacles: no
- Ground and air obstacles: yes (10 kV transmission power line)
- Environmental restrictions: yes (proximity to a residential building is 100 m)
- Buildings or other constructions on the ground: no
- Transport position:
- Roads access to the ground (type and width of available road): the rubble road width 6 m
- The nearest highway / road of national importance (km): tangent to the highway R-15 Kovel-Chervonohrad-Zhovkva) Railway track (km): 14 km
- Railway sidetrack (km): 14 km
- The nearest regular airport (km): Lviv International Airport 140 km
- The nearest sea port (km): 680 km (Gdansk, Republic of Poland), 850 km (Odessa)
- Available Infrastructure
- Electricity: yes
- connection point (distance from the site boundary) 200 m
- electric voltage (kW): 0,4 kW
- Water supply: 200 meters (possibility of building a well)
- Gasification: 30 m to the medium pressure gas pipeline
- Wastewater treatment plants: construction of local treatment plants according to technical conditions
- Telecommunications: dial-up access using a modem and public telephone network, the ability to connect broadband Internet access
- Electricity: yes
- Contact persons:
- Balbuza Veronika Nikolaevna
- Phones:
- +38 (0332) 778 108
- +38 (0332) 778 202




